DictionaryForumContacts

   English
Terms for subject Microsoft containing material | all forms | exact matches only
EnglishItalian
bill of material versionversione distinta base (A specific configuration of a bill of material (BOM) to include an item. An item can be associated with a number of BOM versions)
diffuse materialmateriale con riflessione diffusa (A type of material that determines the color of the 3D object with direct light (white light) applied to it much like the paint on a wall)
emissive materialmateriale con componente emissiva (A type of material that causes the object to appear as if it is giving off light. The color of the light is determined by the color of the material)
finite materialmateriale limitato (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts)
fixed material consumptionconsumo costante del materiale (Absolute quantity of a material resource to be used to complete an assignment. A fixed consumption rate indicates that the amount of material used will be constant, regardless of changes to task duration or assignment length)
infinite materialmateriale illimitato (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed)
keying materialmateriale per le chiavi (The PIN, keys, base prime numbers or other data used in encryption to establish and maintain secure communication)
limited materialmateriale limitato (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts)
material labeletichetta materiale (The unit of measure for a material resource, such as tons, cubic yards, or board feet)
material resourcerisorsa materiale (A supply or other consumable item that is used to complete tasks in a project)
packaging materialmateriale di imballaggio (The material used to bundle goods for protection during shipment)
phantom bill of materialdistinta base fittizia (" A bill of material used to describe the components of a parent part that will be built as part of a higher-level parent part. The term "phantom" is used to indicate that the part never really exists as a stocked item, but rather is built in line with the production of the higher-level part that is driving an overall production order. ")
specular materialmateriale con riflessione speculare (A type of material that controls the color of the specular highlight on a 3D object)
sub-bill of materialdistinta base secondaria (A bill of material that makes up a component of another bill of material)
time and material projectprogetto di tempistica e materiali (An external project that is invoiced as work progresses based on the consumption of hours, expenses, items, fees, and on-account transactions)
unlimited materialmateriale illimitato (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed)
variable material consumptionconsumo variabile del materiale (The time-based quantity of material resource to be used in an assignment. A variable consumption indicates that the amount of material that is used changes if the task duration or assignment length changes)