English | French |
Actual Capacity | capacité réelle (The amount of time a resource has available to work at any given point in time. Actual Capacity is equal to Capacity minus resource calendar exceptions (e.g. offsite training, morale events, jury duty) and previously scheduled committed work (Project task assignments with type = committed). This is the most valuable measure for scheduling a resource) |
Base Capacity | capacité de base (The amount of available time a resource has to work based on their resource base calendar. This is equivalent to the capacity of the position to which the resource is assigned. For example, a resource in a 70% part-time position has a Base Capacity of .7FTE. Not very useful for scheduling but of more value in determining the maximum capacity or cost of an organization) |
capacity load | charge de la capacité (The maximum amount of scheduled work that a work center can perform at a required capacity level) |
capacity planning | planification de capacité (The process of identifying and preparing for the application, hardware, and network requirements to support expected site traffic and achieve site performance goals) |
capacity planning | planification de la capacité (A procedure for determining the resource capacity requirements that meet the demand of future output during specific time periods) |
finite capacity | capacité finie (The capability of a resource (worker, machine, work center, plant, or organization) to produce output within a specified period of time without exceeding the available capacity) |
forced vital capacity | capacité vitale forcée (The volume of air that can forcibly be blown out after full inspiration, measured in liters) |
limited capacity | capacité finie (The capability of a resource (worker, machine, work center, plant, or organization) to produce output within a specified period of time without exceeding the available capacity) |
optimizing on capacity | optimisation des capacités (A limited capacity situation where production is scheduled around existing reservations for work centers. Production begins when capacity becomes available) |