DictionaryForumContacts

   English
Terms for subject Microsoft containing Schedule | all forms | exact matches only
EnglishGerman
budget scheduleBudgetplan (A schedule for the planned expenditure of allocated financial resources)
budget scheduleFinanzplan
Class ScheduleKursplanung (A view in which you can organize class materials into assignments and lessons)
delivery scheduleLieferzeitplan (A schedule for the planned delivery of products)
file replication scheduleDateireplikationszeitplan (The schedule by which Directory Services user lists that are newly uploaded are added to the Administration Center and to e-mail servers worldwide)
finite schedulingbegrenzte Planung (A scheduling method that assumes that limited capacity for labor and machines is available)
job scheduleFeinterminierung (The optimal dates and times for performing jobs at a work center)
master project scheduleHauptprojektzeitplan (A schedule that identifies all the project's activities and milestones, consolidating all team and role schedules. The master project schedule is a deliverable of the planning phase)
personal scheduleprivater Terminkalender (A schedule of activities that are not related to work)
production scheduleProduktionsplan, grafische Plantafel (A schedule to produce a specific item and item quantity at a specific time and by specific human and operational resources)
protection scheduleSchutzzeitplan (A schedule that specifies whether the replica is synchronized with live data on the on an hourly or daily basis as well as the time when shadow copies of the replica are created)
report-specific scheduleberichtsspezifischer Zeitplan (Schedule defined inline with a report. Report-specific schedules are defined in the context of an individual report, subscription, or report execution operation to determine cache expiration or snapshot updates)
Schedule a Conference...Konferenz planen... (An item on the Actions menu that opens a new Outlook meeting invitation using the user's conferencing information)
Schedule a MeetingBesprechung planen (A menu item that opens an Outlook meeting invitation prepopulated with the selected contact(s))
schedule groupPlanungsgruppe (In the Concurrency Runtime, a container for related tasks that are queued to a Task Scheduler)
schedule performance index The ratio of the earned value (EV), which is sometimes referred to as the budgeted cost of work performed (BCWP), to the planned value (PV), which is sometimes referred to as the budgeted cost of work scheduled (BCWS). SPI is often used to estimate the project completion date. The SPI value is calculated as follows: SPI = EV/PV. If the resulting SPI value is less than 1.0, that indicates that less work was completed on the project than was planned. If the SPI value is 1.0 or greater, that indicates that more work was completed than was planned; SPIPlanleistungsindex (PLI)
schedule variancePlanabweichung (The difference between the budgeted cost of work performed [BCWP] and the budgeted cost of work scheduled [BCWS]. This is calculated as follows: SV = Budgeted Cost of Work Performed - Budgeted Cost of Work Scheduled)
Schedule ViewPlanungsansicht (An Outlook Calendar view in which each calendar is listed vertically (not side-by-side). This view is optimized for viewing a schedule for a group and scheduling a meeting for a group)
shared schedulefreigegebener Zeitplan (Schedule information that can be referenced by multiple items)
sync scheduleSynchronisierungszeitplan (The times that will trigger automatic synchronization between a device and Exchange Server every time an item arrives or is modified in Exchange Server)
user-controlled schedulingbenutzergesteuerte Zeitplanung (A feature that allows the user to specify manual or automatic scheduling on a per-task basis)
vesting scheduleÜbertragungsplan (The manner in which-long term variable compensation is distributed to an employee. Long-term incentives are awarded at one time but distributed at a later time)