English | Danish |
bill of material version | styklisteversion (A specific configuration of a bill of material (BOM) to include an item. An item can be associated with a number of BOM versions) |
bill of materials | stykliste (A list of the components and subassemblies needed to build one unit of a product. A bill of materials also shows quantities for each component) |
bill of materials explosion | udfoldning af stykliste (The process of identifying the components, and their quantities, that are required to produce an item) |
bill of materials item | styklistevare (An itemized product defined by a bill of materials) |
class materials | undervisningsmateriale (Content and resources that are made available as part of a class and that can be associated with individual lessons or assignments) |
finite material | materialebegrænsning (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts) |
fixed material consumption | fast materialeforbrug (Absolute quantity of a material resource to be used to complete an assignment. A fixed consumption rate indicates that the amount of material used will be constant, regardless of changes to task duration or assignment length) |
infinite material | materiale uden begrænsning (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed) |
keying material | nøglemateriale (The PIN, keys, base prime numbers or other data used in encryption to establish and maintain secure communication) |
limited material | begrænset materiale (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts) |
packaging material | emballage (The material used to bundle goods for protection during shipment) |
phantom bill of material | fantomstykliste (" A bill of material used to describe the components of a parent part that will be built as part of a higher-level parent part. The term "phantom" is used to indicate that the part never really exists as a stocked item, but rather is built in line with the production of the higher-level part that is driving an overall production order. ") |
phantom bill of materials item | fantomvarestykliste (A bill of materials item that is produced but not stocked) |
return materials authorization number A reference number that is used to authorize and track goods returned for repair or refund. A return materials authorization is issued by a sales entity that authorizes a buying company to return goods | Return Materials Authorization-nummer (RMA-nummer) |
sub-bill of material | understykliste (A bill of material that makes up a component of another bill of material) |
time and material project | tids- og materialeprojekt (An external project that is invoiced as work progresses based on the consumption of hours, expenses, items, fees, and on-account transactions) |
time and materials | tid og materialer (A type of contract in which the final price paid is based on the amount of time it took to complete the project and the cost of the materials used) |
time and materials project | tid og materiale-projekt (A project where the vendor invoices the customer based on work completed on the job. There is a direct relationship between the invoice lines and the usage already performed on the job) |
unlimited material | ubegrænset materiale (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed) |
variable material consumption | variabelt materialeforbrug (The time-based quantity of material resource to be used in an assignment. A variable consumption indicates that the amount of material that is used changes if the task duration or assignment length changes) |