English | Arabic |
bug allotment | مخصصات الخطأ (A chunk of development time allocated to fix bugs. An allotment is created by leaving slack in the iteration plan) |
bug convergence | تقليل الأخطاء (The point at which the rate of fixed bugs exceeds the rate of found bugs. Bug convergence is a visible indication that the team is making progress against the active bug count. It is a sign that the project end is within reach) |
zero bug bounce | مرحلة عدم وجود أخطاء نشطة (" The first point in time after a milestone (typically code complete) that there are no active bugs accepted by the triage meetings that are older a specified amount of time (typically between 3 hours and 3 days). It is referred to as bounce because bugs checked in can cause regressions and these regressions can cause the number of bugs to "bounce" back up from zero.") |
zero bug release | إصدار خال من الأخطاء (The first release to testing after all active bugs have been resolved) |