DictionaryForumContacts

   English
Terms for subject Microsoft containing AT | all forms | exact matches only
EnglishGerman
At Least N MatchesMindestens N Treffer (A menu item that allows the user to search for any pattern A that is represent in pattern B at least n times. Patterns could be strings, characters, etc)
At Most N MatchesHöchstens N Treffer (A menu item that allows the user to search for any pattern A that is represent in pattern B at most n times. Patterns could be strings, characters, etc)
at sign> -Zeichen (The separator between account names and domain names in Internet e-mail addresses)
at sign-Zeichen (The separator between account names and domain names in Internet e-mail addresses)
budget at completionPlankosten (The original project, resource, and assignment cost as shown in the baseline plan. The baseline cost is a snapshot of the cost at the time when the baseline plan was saved)
COMMERCIAL AT> -Zeichen (The separator between account names and domain names in Internet e-mail addresses)
COMMERCIAL AT-Zeichen (The separator between account names and domain names in Internet e-mail addresses)
estimate at completionerwartete Kosten (The expected total cost of a task or project, based on performance as of the status date. EAC is calculated as follows: EAC = ACWP + (BAC-BCWP)/CPI)
estimate at completionberechnete Kosten (The expected total cost of a task or project, based on performance as of the status date. EAC is calculated as follows: EAC = ACWP + (BAC-BCWP)/CPI)
look-at pointBlickfokus (The point in the 3D world where the camera is supposed to point. By default, this is the origina (0,0,0). Typically the look-at point specifies where light is focused)
Preparation of an Opening Balance Sheet at the Date of Transition to IFRSVorbereitung einer Eröffnungsbilanz für das Datum des Übergangs zu IFRS (A template that addresses, from a Finance & Accounting perspective, the significant activities required of companies to prepare their opening balance sheet at the date of transition to IFRS within the context of a conversion from previous Generally Accepted Accounting Principles (GAAP) to International Financial Reporting Standards (IFRS))
purchase at downloadbei Download gekauft (To purchase an app just before downloading and installing it)
variance at completionAbweichung nach Abschluss (The earned value field that shows the difference between the budget at completion [BAC] and the estimate at completion [EAC]. In Project, the EAC is the Total Cost field, and the BAC is the Baseline Cost field)