εκτίμηση από κάτω προς τα πάνω | bottom-up estimating (A principle of good scheduling. It means having those who do the work estimate the effort, rolling up task-level estimates, and recognizing that experience is the best estimating technique) |
εκτίμηση κατά την ολοκλήρωση | estimate at completion (The expected total cost of a task or project, based on performance as of the status date. EAC is calculated as follows: EAC = ACWP + (BAC-BCWP)/CPI) |
Εντοπισμός και εκτίμηση κινδύνου | Discovery and Risk Assessment (A Microsoft Office product that identifies business-critical Excel spreadsheets and Access databases by discovering files across network shares and SharePoint libraries, and that provides flexible risk assessment and categorization based on relevance, materiality and business impact) |
χονδρική εκτίμηση τάξης μεγέθους | rough order-of-magnitude estimate (An estimate done without detailed costing, or based on initial or incomplete data. It estimates the general size and scope of a project) |