DictionaryForumContacts

   Chinese
Terms for subject Metallurgy containing | all forms
ChineseEnglish
一般线性规问题general linear programming problem
会聚型三辊式轧管机 CAP computer-aided planning 计算机辅助计convergent Assel mill
作业计schedule
停炉计planning of blow out
全面计方案overall project
公关计public relations plans
冶金功能division of metallurgical function
凸规问题convex programming problem
出铁场改造规casthouse transformation plan
reticle
切割机cutting machine scratch
scratch
tear
zoning
partition
分区域demarcation
图案patterning
scoring
scratch marks (钢板表面缺陷)
scotch
score
mar
痕器scratcher
痕硬度scratching hardness
痕硬度scratch hardness
痕硬度值scratch hardness number
痕硬度值scratch hardness number
痕硬度刻度scratch hardness scale
痕硬度试验scratch hardness test
痕硬度试验机scratch hardness tester
痕试验scoring test
痕试验scoring test
痕阻力scratch resistance
线sketch (钢板剪切前的)
线marking-out
线marking
线marking-off
线lining-out
线冲子prick punch
线区段marking-out section
线台marking-off table
线平台tracing-up plate
线平台layout block
线平台faceplate
线平板faceplate
线机marker
线机scriber
线机measuring machine (厚板剪切机的)
线规shifting gauge
线规marking gauge
线辊道marking table
线辊道main mill table
线针scriber
草图sketch
portion
区带zoning arrangement
城市规city lay-out
基本建设规capital construction program
大区规broad planning
大型工程major project
对称线性规symmetric linear programming
导卫guide scratch
导卫guide score
导卫guide marks (轧材缺陷)
导卫guide mark
导板guide scratch (轧材缺陷)
导板guide scores (轧材缺陷)
工作计working scheme
工作计working programme
工程计engineering project
开工计start-up programme
开炉计planning of blow-in
弹簧线冲子spring centre punch
痕硬度试验计microcharacter
总体规设计general planning
总体规设计阶段general planning period
总计general plan
恢复规rehabilitation programme
扩建规expansion program (【参】本例句英文摘自美国英文原版文献。在美国, ton 即美吨,约等于 907. 2kg。 故本例句中的 from 550, 000 to 1 million tons 译成了 "由55万美吨提高到100万美吨"。有关 ton 的含义与量值,: Tuscaloosa Steel has completed a $154 million expansion program that has increased annual capacity from 550, 000 to 1 million tons. 塔斯卡鲁萨钢公司现已完成了耗资 1. 54 亿美元的扩建规划,将年生产能力由55万美吨提高到100万美吨)
扩建规expansion plan
扩建计expansion schedule
扩建计expansion plan
技术发展规technological development program
投产计start-up programme
拉模die scratch
拉模die score
搬运造成的handling scratch
擦你scratch
施工计construction programme
显微痕硬度试验计microcharacter
显微硬度microcut
最后计final project
模面纵向die line
波道的按时time division of channels
线dot-and-dash line
线dash-and-dot line
烧结试验计sintering testwork programme
热轧带hot strip scratches
热轧带钢hot strip scratches
生产规production planning
生产规production plan
生产计production schedule
生产计production program
生产计operating plan
生产计scheduler (按订货要求制定轧制图表者)
线dash line
研究规阶段research planning stage
离散discrete programming
纵向die line (拉拔或挤压产品因模表面缺陷而引起的)
综合计方案overall project
编制计scheduling
芯棒plug lines (冷拔管缺陷)
芯棒plug line
表面surface scratch
表面surface tears (由轧辊表面刻槽或焊纹引起的)
表面surface tear
表面痕硬度surface scratching hardness
表面痕硬度试验surface scratching hardness test
表面痕试验surface scratching test
设备mapping device
device
skeleton
blue print
任务prospectus
产量scheduled production
产量designed output
休风planned blow-down (【技】为完成高炉事先安排的检修等而有计划地停止送风冶炼。超过 4h 的休风叫长期休风;不足 4h 的休风叫短期休风。)
休风planned shutdown
休风planned wind-off
休风scheduled delay
休风scheduled delay
休风时间planned blowing-down time
休风时间scheduled downtime
停风scheduled delay
内项目planned project
外固定资产投资fixed-asset investment outside the plan
外建设项目construction project not included in the plan
大修planned reline (Blast furnace projects include a planned reline of D furnace in 1998 and a rebuild of No.3 D furnace stove in 1997.高炉项目包括 D 高炉于 1998 年进行计划大修和 D 高炉 3 号热风炉于1997年进行重建。)
检修preventive maintenance
检修schedule repair
检修planned repair
检修scheduled maintenance
检修proposed repair
检修进度表preventive maintenance schedule
连浇炉数planned sequence length
连铸钢年产量planned annual production of continuously cast steel
试车计start-up programme
调整计replanning
轨道线台layout table
辊道线台lay-out table
远景规long-range planning
远景规far seeing plan
连铸发展规continuous casting development programme
酸洗pickle house scratch
重新计replanning
长期规long-range planning
伤处理antiscuffing treatment
伤膏antiscuffing paste
随意计轧制schedule-free rolling
非线性规non-linear programming
非计停工机,炉unscheduled shutdown
非计停工 炉、机、风unscheduled shutdown
非计停工风,机, 炉unscheduled delay
非计停风unscheduled delay
非计停风unscheduled blow-down
非计检修unscheduled inspection and repair
非计unscheduled
非计维修时间nonscheduled maintenance time
马登斯表面痕硬度Martens surface scratching hardness
马登斯表面痕硬度值Martens hardness number
马登斯表面痕硬度试验Martens' test
高炉大修计进度blast furnace relining schedule
高炉计检修planned maintenance of blast furnace (【技】高炉在长期的连续生产中,按计划休凤进行设备与装置的检查、维修和更换。计划检修分为定期计划检修和不定期计划检修。定期计划检修指的是为使高炉生产达到高产、低耗、高效、安全的目的,每月定期进行一次的计划检修,通常需休凤几小时,进行检修与更换设备零部件等;不定期计划检修指的是当设备或装置发生难以继续运行的故障时需进行的较长时间的检修。)