English | Danish |
bill of material version | styklisteversion (A specific configuration of a bill of material (BOM) to include an item. An item can be associated with a number of BOM versions) |
finite material | materialebegrænsning (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts) |
fixed material consumption | fast materialeforbrug (Absolute quantity of a material resource to be used to complete an assignment. A fixed consumption rate indicates that the amount of material used will be constant, regardless of changes to task duration or assignment length) |
infinite material | materiale uden begrænsning (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed) |
keying material | nøglemateriale (The PIN, keys, base prime numbers or other data used in encryption to establish and maintain secure communication) |
limited material | begrænset materiale (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts) |
material label | materialenavn (The unit of measure for a material resource, such as tons, cubic yards, or board feet) |
material resource | materialeressource (A supply or other consumable item that is used to complete tasks in a project) |
packaging material | emballage (The material used to bundle goods for protection during shipment) |
phantom bill of material | fantomstykliste (" A bill of material used to describe the components of a parent part that will be built as part of a higher-level parent part. The term "phantom" is used to indicate that the part never really exists as a stocked item, but rather is built in line with the production of the higher-level part that is driving an overall production order. ") |
sub-bill of material | understykliste (A bill of material that makes up a component of another bill of material) |
time and material project | tids- og materialeprojekt (An external project that is invoiced as work progresses based on the consumption of hours, expenses, items, fees, and on-account transactions) |
unlimited material | ubegrænset materiale (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed) |
variable material consumption | variabelt materialeforbrug (The time-based quantity of material resource to be used in an assignment. A variable consumption indicates that the amount of material that is used changes if the task duration or assignment length changes) |