DictionaryForumContacts

   English
Terms for subject Microsoft containing Material | all forms | exact matches only
EnglishDanish
bill of material versionstyklisteversion (A specific configuration of a bill of material (BOM) to include an item. An item can be associated with a number of BOM versions)
finite materialmaterialebegrænsning (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts)
fixed material consumptionfast materialeforbrug (Absolute quantity of a material resource to be used to complete an assignment. A fixed consumption rate indicates that the amount of material used will be constant, regardless of changes to task duration or assignment length)
infinite materialmateriale uden begrænsning (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed)
keying materialnøglemateriale (The PIN, keys, base prime numbers or other data used in encryption to establish and maintain secure communication)
limited materialbegrænset materiale (A method for scheduling resources that assumes that all the component materials needed for production are available when the production process starts)
material labelmaterialenavn (The unit of measure for a material resource, such as tons, cubic yards, or board feet)
material resourcematerialeressource (A supply or other consumable item that is used to complete tasks in a project)
packaging materialemballage (The material used to bundle goods for protection during shipment)
phantom bill of materialfantomstykliste (" A bill of material used to describe the components of a parent part that will be built as part of a higher-level parent part. The term "phantom" is used to indicate that the part never really exists as a stocked item, but rather is built in line with the production of the higher-level part that is driving an overall production order. ")
sub-bill of materialunderstykliste (A bill of material that makes up a component of another bill of material)
time and material projecttids- og materialeprojekt (An external project that is invoiced as work progresses based on the consumption of hours, expenses, items, fees, and on-account transactions)
unlimited materialubegrænset materiale (A method for scheduling resources that assumes that all the component materials needed for production are available at the time they are needed)
variable material consumptionvariabelt materialeforbrug (The time-based quantity of material resource to be used in an assignment. A variable consumption indicates that the amount of material that is used changes if the task duration or assignment length changes)