DictionaryForumContacts

 Sr Curioso

link 9.11.2014 22:14 
Subject: [welding] machine allocation logist.
Помогите, пожалуйста, с переводом:

Standard lead times for machine allocation are two to four weeks ARO and material. To ensure proper execution of requirements, verbal instructions, emails, etc. as a substitute for a PO, are not accepted.

Заранее спасибо

 wow1

link 9.11.2014 22:45 

 

You need to be logged in to post in the forum