|
link 9.11.2014 22:14 |
Subject: [welding] machine allocation logist. Помогите, пожалуйста, с переводом:Standard lead times for machine allocation are two to four weeks ARO and material. To ensure proper execution of requirements, verbal instructions, emails, etc. as a substitute for a PO, are not accepted. Заранее спасибо |
You need to be logged in to post in the forum |