Subject: production units mining. The second phase consists of construction of production units IV, V and VI. Production unit IV (deep shafts) will be brought into operation between 201_ and 201_.
|
|
link 13.07.2013 8:13 |
Горнодобывающие мощности. |
Однако встречается "добычнОй участок" 4-й, 5-й и пр. |
You need to be logged in to post in the forum |