Subject: steady heading nautic. steady headingкак это можно перевести? The Continuous Bollard Pull (CBP) test shall be carried out at the manufacturer’s recommended maximum continuous rating of the main engines (100% MCR), for a period of 10 minutes (see IMO requirements in Ref [2]) with the vessel on a steady heading спасибо |
|
link 24.06.2013 13:11 |
м.б. поможет: heading - по курсу |
on a steady heading на постоянном курсе |
You need to be logged in to post in the forum |