Subject: 3GP AND CORE SUBSTATION SITE PREPARATION gen. Как перевести, помогите, пожалуйста.
|
Контекст: The scope of this strategy is to enumerate and separately describe CONTRACTOR’s proposed Construction Techniques for Underground Crossings to Existing Roads at the 3GP and Core Substation Site Preparation Project. |
You need to be logged in to post in the forum |