DictionaryForumContacts

 Бейбарыс

link 28.07.2011 6:51 
Subject: помогите с переводом с русс на англ SAP.fin.
В случае возникновения необходимости после проведения Работы оставления в скважине подземного технологического оборудования Суб-Подрядчика, Генеральный Подрядчик компенсирует Суб-Подрядчику прокат этого оборудования сверх установленных пяти суток по тарифу 130 000,00 (сто тридцать тысяч) тенге за каждые последующие сутки на основании выставленного счета и счета-фактуры в течение срока, определенного п.6.2. настоящего договора.
In case of arising of necessity, after Work execution, to leave in the well the equipment of the Subcontractor, then General Contractor compensates to Subcontractor the rent of the equipment in addition to stipulated five days at the rate of 130 000, 00 (one hundred thirty thousand) tenge for each following day on the basis of submitted bill and invoice within the terms stipulated in article 6.2. to the present Agreement.

 Gennady1

link 28.07.2011 7:14 
In case of necessity to leave the Subcontractor's underground production equipment in the well upon the work completion, the General Contractor shall compensate the Subcontractor cost of renting of this equipment in excess of the stipulated five days at the rate of 130,000.00 tenge for every consequent day based on the bill and the invoice withing the period established in Article 6.2. to the present Agreement.

 matroskin cat

link 28.07.2011 7:30 
Should it be necessary to leave Subcontractor's process equipment in the well after the work has been General Contractor is to/shall complete Subcontractor for equipment renting in excess of five days set at the rate of 130,000.00 130 000, 00 (one hundred thirty thousand) ................within the period set forth/provided by article 6.2. hereof.

 VladimirM

link 28.07.2011 7:33 
оставления в скважине - Lost-In-Hole (LIH)
подземное технологическое оборудование - downhole equipment

 Бейбарыс

link 28.07.2011 9:15 
Thank you all

 Тимурыч

link 28.07.2011 10:00 
Еще вариант:

If, upon completion of Services, it is required that the Subcontractor's downhole equipment is not retrieved/pulled out of hole, the General Contractor shall pay the Subcontractor a daily rate of 130,000.00 (one hundred and thirty thousand) tenge for each day in excess of five days lease within the period set forth in article 6.2. of this Agreement.

 

You need to be logged in to post in the forum