DictionaryForumContacts

 girl from ipanema

link 2.11.2010 15:59 
Subject: ghlighted fixed points,deaerating points
If public heating network is used, consider installing a backup electrical boiler for SHW preparation
during planned maintenance outages.
Technical requirements:
• water pumps shall have pressure gauge fitted on intake and discharge
• there shall be strainers installed before heat exchangers
• the design shall contain highlighted fixed points, dilatation compensators and deaerating
points

 

You need to be logged in to post in the forum