контекст это ТУ на электростанцию9.2.1.4 Control and Instrument Piping Design and Selection Criteria Control and Instrument piping shall be designed in accordance with the following criteria: - The piping and instrument diagrams shall indicate the size and selection information for piping through the primary isolating valves. The line sizes and selection information of pip-ing after the primary isolating valves shall not be called out on the P&ID. ... ... - Temperature indicators, temperature controllers, temperature switches, temperature detec-tors, and test well connections shall be as follows: - HP, IP and reheat steam 40 mm Socket Weld - LP steam 32 mm Socket Weld - Boiler Feedwater 32 mm Socket Weld - Duct temperatures 25 mm Nominal Pipe Thread - All others 20 mm Nominal Pipe Thread - Flow transmitter connections and piping through the primary isolating valves shall be 25 mm for all piping except orifice flanges where 15 rnm piping and valves shall be used. - Level switch connections and piping through primary isolating valves shall be 25 mm. - Level controllers and level transmitters of the displacement type shall have connections and piping through primary isolating valves of 50 mm. - Level controllers and level transmitters of the differential pressure type shall have connec-tions and piping through primary isolating valves of 25 mm. - Instrument columns at tanks and pressure vessels shall be 65 mm minimum
|