Subject: и снова SAP!!!
Уважаемые, помогите пожалуйста разобраться в этом абзаце:

The product calculation is a based a certain “costing lot size” (see material master, costing view 2). All lot size independent costs (set up costs, change over costs) are allocated per lot (= production order). If the costing lot size is smaller than the real (actual) production order lot size the fixed costs calculated for standard price higher than the actual fixed costs and vice versa. These differences are called lot size variances.

Спасибо ЗАРАНЕЕ!!!

 