Subject: the traditional design bid build delivery system transp. Пожалуйста, помогите перевести.Выражение встречается в следующем контексте:In addition to the challenges arising from the fast-tracked foundation, the traditional design/ bid/build delivery system had to resolve a number of issues that arose during the design phase of the project. Заранее спасибо |
You need to be logged in to post in the forum |