link 8.08.2007 6:48 
Subject: below the completion
1. below the completion ниже вскрытия перфорацией???
2. installation of the upper completion установка верхнего вскрытия перфорацией???

Drop the guns immediately after perforating. This requires a special connector called a drop sub, sufficient wellbore depth below the completion, a wellbore deviation less than about 60 degrees and prior installation of the upper completion. In these circumstances, the well can be perforated with an initial underbalance, the guns dropped and the well immediately placed on production. This is the least damaging of the three choices.

Заранее спасибо

 cinne68

link 8.08.2007 7:58 
completion еще и оборудование скважины, ее используемой части.

может, ниже эксплуатационной части скважины и установка этой самой верхней части?

 10-4

link 8.08.2007 9:08 
sufficient wellbore depth below the completion = достаточная глубина скважины ниже зоны перфорации
prior installation of the upper completion = предварительное заканчивание скажины в верхнем интервале

 