词典论坛联络

 Puma

链接 5.06.2005 7:02 
主题: zone of structurally controlled clay alteration
Полное предложение:
Condemnation holes drilled in the tailings area, 1.5 km southwest of BB zone, have intersected a large of structurally controlled clay alteration similar to the upper part of the North zone.

 10-4

链接 6.06.2005 7:50 
Зона структурно зависимого преобразования в глинистое вещество (или - преобразования глинистого вещества)

 

您须要先登入才能参与论坛活动