| chemin critique | |||
| indispensables m | |||
| chemin critique (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) | |||
| |||
| chemin critique (méthode PERT) | |||
|