![]() |
| |||
| ieplānot (To program a computer to perform a specified action at a specified time and date); grafiks (The timing and sequence of tasks within a project) | |||
| |||
| Plānot (A button that launches the Service Scheduling form) | |||
| Inglés tesauro | |||
| |||
| skd; sked (short for schedule or scheduled Val_Ships) | |||
| Some standards ANSI, JIS feature different pipe schedules of a pipe which are defined by the wall thickness; the higher the schedule value, the thicker is the wall. Different schedules for pipes of one nominal width mean different inner diameters | |||
| scd; sch | |||
| sche | |||
| |||
| S | |||
| |||
| shedule (schedule - распространенное неправильное написание слова sChedule. повторите поиск с правильным написанием, или просто перейдите по ссылке SirReal) | |||
|
schedule : 23 a las frases, 7 temas |
| Ambiente | 1 |
| Economía | 1 |
| El comercio internacional | 1 |
| General | 2 |
| Microsoft | 16 |
| Política | 1 |
| Transporte | 1 |