![]() |
| |||
| camino crítico; ruta crítica | |||
| ruta crítica (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) | |||
|
critical-path : 13 a las frases, 4 temas |
| Economía | 4 |
| Microsoft | 2 |
| Política | 2 |
| Tecnología de la información | 5 |