| critical path | |
| comp., MS | kritik yol |
| method | |
| environ. | metot; yöntem |
| |||
| kritik yol (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) | |||