![]() |
| |||
| ruta crítica (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project) | |||
| camino crítico; ruta crítica | |||
|
Critical Path : 13 phrases in 4 subjects |
| Economics | 4 |
| Information technology | 5 |
| Microsoft | 2 |
| Politics | 2 |