| |||
Leak off test | |||
| |||
leakoff test; breakdown test (BDT); formation leak off test (LOT) | |||
formation integrity test (FIT is conducted to confirm a good cement job or determine the formation's resistance to fracture. The most common method is the leak-off test (LOT) where pressure is applied until the formation accepts a small amount of drilling fluid. An optional method is the formation integrity test which confirms that the formation can resist a pre-determined amount of pressure. traduiser) |
Испытание на гидроразрыв: 9 Phrasen in 3 Thematiken |
Allgemeine Lexik | 3 |
Bohren | 1 |
Sachalin | 5 |