Wörterbücher
Forum
Kontakte

   Russisch Englisch
Google | Forvo | +
Была произведена закачка азота в скважину для вызова притокаBetonungen
karach. the well is kicked off with N2 lift (the injection of nitrogen into the fluid column within the production conduit to initiate fluid flow from the wellbore and production from the reservoir. Nitrogen lifting through a coiled tubing string is a common technique used in well kickoff, – Schlumberger Oilfield Glossary)