| critical path | |
| micr. | 중요 경로; 요주의 경로 |
| scheduling | |
| IT | 스케줄링 |
| |||
| 중요 경로 (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project); 요주의 경로 (The series of tasks that must be completed on schedule for a project to finish on schedule. Each task on the critical path is a critical task) | |||
|
critical path : 2 Phrasen in 1 Thematik |
| Microsoft | 2 |