critical path

Bauw. chemin critique
micr. chemin critique (The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project)
vereint., Wirtsch. indispensables m
critical path PERT method
Fin. chemin critique (méthode PERT)